Inactive
Notice ID:19GR10-23-Q0022
The purpose of this scope of work is the installation of counter balanced railing placed on top of the roof membrane (e.g., non-penetrating). at the MSGQ roof and balconies. The roof structures of the...
The purpose of this scope of work is the installation of counter balanced railing placed on top of the roof membrane (e.g., non-penetrating). at the MSGQ roof and balconies. The roof structures of the MSGQ do not have fall prevention measures in place.