Recreational Center (WV) pool repairs
19CF2026Q0008
The U.S. Embassy in Brazzaville requires a contractor to perform comprehensive swimming pool renovation at Villa Washington, including sealant and tile removal, resurfacing, leak correction, and debris cleanup. The work must be performed in Brazzaville, Republic of the Congo. The performance period is 60 calendar days from the contract award date. The total estimated budget for this project is $95,000. All work must comply with local and U.S. standard construction practices.