Life Support Services
This contract opportunity involves extending life support and maintenance services during the drawdown of the Residential and Embassy Compounds and the transition to the New Embassy Compound (NEC). The proposed extension period runs from 1 June 2026 through 31 December 2028, with a possible extension to 28 February 2029 if the NEC opening is delayed. The NEC is projected to open between December 2028 and February 2029. After the extension, reduced services will be needed for an additional eight months (March 2029 to October 2029) for final closeout. The location for performance includes the Residential Compound, Embassy Compound, and the New Embassy Compound.