INTERIOR REPAIRS SALLYPORT 1ST AND 3RD FLOORS
The project involves interior repairs at the Metropolitan Detention Center in Brooklyn, NY, located at 80 29th Street, Brooklyn, NY 11232. Work includes removing existing vinyl composition tile and installing industrial-grade epoxy flooring in the first and third floor sallyports. The performance period is 210 calendar days from issuance of the notice to proceed, with an estimated budget between $100,000 and $250,000. This is a 100% small business set-aside requiring SAM registration and a mandatory site visit. Offerors must also provide a bid bond, completed SF 1442, and a technical process summary.