FCI Elkton - Upgrade Fire Pump
The Bureau of Prisons anticipates a firm-fixed-price construction contract to upgrade the fire pump at FCI Elkton, 8730 Scroggs Road, Lisbon, OH 44432, with a 181-calendar-day period of performance from Notice to Proceed and an estimated magnitude of $250,000–$500,000. This is a 100% small business set-aside under NAICS 238210, requiring SAM registration and a valid MPIN to access secure solicitation documents on sam.gov. The scope includes removing the existing diesel fire pump controller and related components and furnishing/installing a new UL-listed diesel fire pump controller in a NEMA 4/4X enclosure, plus demolition, conduit/wiring, battery systems, DDC/Desigo integration, and commissioning/testing per NFPA 20 and FBOP requirements. Quotes will be evaluated on price, technical capability, and past performance; an organized site visit was held October 7 at 9:00 am EDT, and Amendment 0002 incorporates the site visit minutes and photos.