Replace Chairlift-FCI Loretto
The Bureau of Prisons at FCI Loretto seeks a small-business contractor to furnish and install a new ADA-compliant chairlift, replacing the existing chairlift in the same location, including all labor, materials, tools, equipment, testing, measurements, and manufacturer installation recommendations. The chairlift spans 16 stairs, turns at a landing, continues up three more stairs, uses a 240V dedicated circuit, and must have a 660 lb capacity with obstruction sensors, safety lights, emergency manual folding/lowering, safety barrier arms, and overspeed safety. Work must comply with FBOP Technical Design Guidelines, seismic requirements, environmental compliance, Life Safety, NFPA, ADA-ABA, and federal, state, and local codes; performance is 90 calendar days from notice to proceed. The acquisition is a 100% small business set-aside under NAICS 238290 with a $22 million size standard, and offerors must include a specification sheet/submittal information and maintain active SAM registration/MPIN access. A site visit at FCI Loretto is scheduled for September 30, 2026 at 10am EST (attendance encouraged but not mandatory), with NCIC background check forms due September 25 and written questions due October 6.