FCC Pollock- Replace FPC Chiller No. 2
This is a small business set-aside for the supply and installation of a new 52-ton Air-Cooled Scroll Chiller at the Federal Correctional Complex in Pollock, LA. The contractor must remove the existing system and provide all labor, materials, and equipment for the new installation. The period of performance is 120 calendar days from the date of award. The contract will be Firm-Fixed-Price, awarded using the Lowest Price-Technically Acceptable method. No budget amount is specified.