FCI Englewood - Repair FDC PK Boiler
This is a set-aside for small businesses to supply and install a new heat exchanger for a boiler at FCI Englewood in Littleton, Colorado. The work involves removing the existing unit and installing a new Patterson Kelley or equal system, restoring the boiler to full operation. A mandatory site visit is scheduled for March 18, 2026, and NCIC background check forms are due by March 13, 2026. The quotation due date is March 25, 2026. The contract will be firm-fixed-price and evaluated using the Lowest Price – Technically Acceptable method.