Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:15B51621Q00000009
The contractor shall provide all personnel, equipment, tools, materials, supervision, storage containers, vehicles, equipment, tools, rental equipment, etc., and other items and services necessary to ...
The contractor shall provide all personnel, equipment, tools, materials, supervision, storage containers, vehicles, equipment, tools, rental equipment, etc., and other items and services necessary to repair fire pump. FTA1350-AM60B-TSA Wye Delta Closed Transition Fire Pump Controller 60HP @ 440v - 480v/60~ Repair existing A C horizontal split case fire pump ( 1000 gpm @ 75 psi ). This will include removing pump head and rotating assembly, machine or replace brass sleeves, dynamically balance mainshaft and impeller, replace inboard and outboard bearings and seals, replace all packing and gaskets, replace all necessary bolts. Reassemble and run at churn for proper churn pressure and adjust for proper drip. Please see attached Statement of Work for all requirements. Please make sure all requirements can be met.