Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:15B31621Q00000006
The contractor receiving the award shall provide all labor, materials, equipment, tooling, installation, testing, and certification for this project commonly referred to as "Replace Fire Suppression S...
The contractor receiving the award shall provide all labor, materials, equipment, tooling, installation, testing, and certification for this project commonly referred to as "Replace Fire Suppression System". This project will consist of purchasing, replacing, and disposing of the existing Fire Suppression System. All work provided will be in accordance to the attached Statement of Work. Rear dock of facilities: Approximately 700' of main line with 62 legs(10-12 feet) with double sprinkler heads on all legs with the exception of one. Warehouse Dock: Approximately 350' of main line with 15 legs(10-12 feet) with double sprinkler heads on each leg Shower banks: approximately 30' long each with two legs, 1 sprinkler head per leg. Shower banks will be changed from the ceiling pendant to a wall pendant. Nitrogen System installed on both dry systems The fire suppression system is required to be operational and charged back at the end of each day.