FY26 FCI Berlin Remove and Replacement of Six (6)Dock Levelers
The Federal Bureau of Prisons seeks a contractor to remove and replace six existing dock levelers with six new 6'x8' hydraulic dock levelers at FCI Berlin in Berlin, NH. The contractor must supply all tools and equipment, perform necessary concrete repairs and electrical work, conduct operational testing, and hold proper New Hampshire licensing and certifications. Services will be performed on-site after contract award, with work scheduled in estimated one-hour intervals between 7:30am and 3:30pm, Monday through Friday, excluding federal holidays. Quotes must be submitted by email only, and offerors are encouraged to include technical information on hydraulic levelers. Delays due to the correctional setting may occur, with a predetermined trip fee compensating the contractor for scheduled days when work cannot be performed.