FMC Devens - Laundry Hot Water Project
This is a total small business set-aside construction project to refurbish the hot water heater at the Federal Medical Center in Devens, Ayer, Massachusetts. The contractor must provide all materials, labor, and equipment, with work including insulating all newly installed lines and using 1” fiberglass wrap for the tank. The project requires maintaining 160-degree water in a 2,000-gallon tank, with steam pressure available up to 13lbs, and press-type fittings are acceptable. Award will be based on best value considering price and past performance, with the project starting 10 days from notice to proceed and completing within 90 days. Removed materials must be left within the mechanical room, no more than 30 feet from the work area.