UNITED STATES COAST GUARD KETCHIKAN ALASKA NEW CARPET INSTALLATION
The U.S. Coast Guard is seeking a contractor to remove/dispose of existing carpet and furnish/install new carpet at Base Ketchikan, AK, specifically the entire third floor/deck of the Administrative building including all hallways. The anticipated award and installation start date is November 2026, with a period of performance of 90 calendar days from the signed government contract award. No pre-award site walk is planned or required, and work will generally be performed Monday–Friday between 0700 and 1630 AKST or by pre-scheduled appointment. Award will be made to the lowest-priced, technically acceptable, qualified contractor and is contingent on the USCG securing funded award. The contractor must provide all labor, supervision, materials, supplies, equipment, tools, and transportation except utilities and limited facilities.