SHI Replace Lead Glazed Bathtubs at United States Coast Guard Rio Bayamon Housing Base San Juan, Puerto Rico PNUM 24658602
The U.S. Coast Guard is conducting a sources-sought market survey for design-build services to replace 120 existing lead-glazed bathtubs at its Rio Bayamon Housing Base in San Juan, Puerto Rico. The contractor must perform pre-construction asbestos and lead-based paint surveys/testing, remove and replace tubs with lead-free steel glazed bathtubs secured to walls, and properly characterize, recycle, or dispose of waste with required certification. The design and construction performance period is 240 calendar days, and the estimated procurement value is between $1,000,000 and $5,000,000. Bid, payment, and performance bonds are required, and the Coast Guard is considering a HUBZone, VOSB, SDVOSB, or WOSB set-aside. Tentative project timelines indicate solicitation issuance in October 2026 and contract performance completion in July 2027.