Repair Waterfront – Phase 2 at USCG Station Portsmouth Harbor (New Castle, New Hampshire)
This project involves repairing the waterfront at USCG Station Portsmouth Harbor in New Castle, New Hampshire, with a base bid and two optional items. The work includes bulkhead repairs, repointing quay walls, replacing fences, restoring rip-rap, recoating guide piles, and installing a new timber floating dock. The construction magnitude is between $1,000,000 and $5,000,000. The contract completion date for the base bid is 189 calendar days from the Notice to Proceed, with options adding 7 or 14 additional days if exercised. A site visit is scheduled for April 8, 2026.