Drydocks (DD) – USCG WMSL-418 (NSC) FY28-33 Pacific Area
The U.S. Coast Guard Surface Forces Logistics Center is conducting market research for drydocking six Pacific Area-based Maritime Security Cutters, Large (WMSL). The anticipated effort spans Fiscal Year 2028 through 2033, with a contract performance period from 15 March 2028 to 30 September 2033, including six planned drydocks and one emergent drydock. The WMSLs are homeported at 42 Eagle Rd, Alameda, CA, and 400 Sand Island Access Pkwy, Honolulu, HI 96819. USCG does not plan to geographically restrict drydocks to each vessel’s homeport, and the minimum draft for the 418-ft vessels is 24.5 ft. Anticipated work items are provided in an attachment.