USCGC BERTHOLF OIL PURIFIERS TECHNICAL SERVICE
The U.S. Coast Guard requires a contractor to provide technical services for the inspection, diagnosis, and overhaul of the Fuel Oil Purifiers (FOP) onboard the USCGC BERTHOLF. The contractor must install provided parts and perform a system overhaul, ensuring compliance with manufacturer's procedures. Performance of services will take place at the CGC BERTHOLF, located at B Street Pier in San Diego, CA 92132. The period of performance is scheduled for August 1-2, 2026, with the contractor coordinating for two days of work. This is a total small business set-aside, and the contract will be awarded on a firm-fixed-price basis.