USCGC Bertholf Turbine CPU and Install
This is a technical services contract to inspect, troubleshoot, and repair a Woodward MicroNet NT CPU on the USCGC BERTHOLF, including providing and installing a new CPU and performing a system upgrade. The work requires one Field Service Engineer for two separate site visits, each involving two 10-hour travel days and two 10-hour work days. The first visit will occur from February 21 to February 22, 2026, in San Juan, Puerto Rico, with the second visit to be determined. Parts must be delivered to Alameda, California. The contractor must provide a field report within five working days of each site visit.