Dockside (DS) – USCGC STORIS Fiscal Year 2027
The U.S. Coast Guard is seeking industry capability and interest for FY27 dockside repair work on the USCGC STORIS. Performance will occur at the cutter’s homeport in Seattle, WA. The estimated period of performance is October 1, 2026 through September 31, 2027, with an anticipated 8-week work window running from March 18, 2027 to July 10, 2027. Scope includes tank cleaning and inspection, valve overhauls, crane maintenance, life raft and davit inspections, and various system repairs. This is a sources sought notice for planning purposes only, not a solicitation.