Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70Z08525Q12824
Points of Contact: CGC Hickory 4000 Coast Guard Boulevard Portsmouth, VA, 23703 231-944-2157 Email: brandon.w.seitz@uscg.mil Product Line Support: LTJG Christopher Lansing 443-764-4921 Christopher.g.l...
Points of Contact: CGC Hickory 4000 Coast Guard Boulevard Portsmouth, VA, 23703 231-944-2157 Email: brandon.w.seitz@uscg.mil Product Line Support: LTJG Christopher Lansing 443-764-4921 Christopher.g.lansing@uscg.mil Description of Problem: CGC Hickory has had significant issues operating their Fuel Oil Purifier (FOP) system and have exhausted organic support on troubleshooting and identifying necessary repairs. They are requesting two days off on site to support to identify necessary parts to replace to effect repairs. They are currently experiencing FOP discharges oil through the water outlet, no discharge through the product outlet. Small knick seen on sealing face of sliding bowl body. Replaced O-rings and seals following the intermediate service kit. Systems point to broken oil/water seal during separation process. Tech Rep Requirements: Contractor will be certified to work on Alpha Laval specific equipment and systems. Fuel Oil Purifier Info: WHPX-405-TGD-24-60 Work to be performed: Two days of on site technical assistance and identification of necessary parts to purchase to affect repairs. Desired Period of performance Windows: Flexible based on the operational schedule of the cutter Technical references: SFLC Std Spec 0000 General Requirements SFLC Std Spec 0740 Welding and Allied Processes SFLC Std Spec 5000 Auxiliary Machine Systems SFLC Std Spec 5550 Fire Prevention and Response