Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70Z08525Q12303
STATEMENT OF WORK CGC MOBILE BAY OPFAC: 09-17503 LOCATION: Sturgeon Bay, WI EQUIPMENT: Barge Crane COMPONENT AFFECTED: Engineering Study to renew/design outdated obsolete/unrepairable components. Draw...
STATEMENT OF WORK CGC MOBILE BAY OPFAC: 09-17503 LOCATION: Sturgeon Bay, WI EQUIPMENT: Barge Crane COMPONENT AFFECTED: Engineering Study to renew/design outdated obsolete/unrepairable components. Drawing: APPLETON MARINE_CRANE ASSEMBLY_AMD 852 MPC: NA POP: 01MAY2025-01June2025 Contractor must design Crane swing drive assembly to renew all obsolete and unrepairable components, restore system back in normal operation once test is completed. Contractor must ensure all connections, fittings, and equipment within the crane system are operating correctly as well. Any discrepancies found shall be noted; and corrected only if no other cost is needed. If any discrepancy causes cost outside the quote, this shall be routed through customer before discrepancy is corrected. UNIT POC: Mobile Bay POC CWO Josh Deisher (920) 743-7351 Address: USCGC Mobile Bay WTGB103 36 S Neenah Ave Sturgeon Bay WI 54235