Inactive
Notice ID:70Z08522P38947
Scope of Work: CGC Stone Pipe Fabrication POP: 9/12 – 9/19, tentative confirmation through Cutter POC (access to Base must go through Cutter POC) Location: USCG Base Charleston 1050 Register Street, B...
Scope of Work: CGC Stone Pipe Fabrication POP: 9/12 – 9/19, tentative confirmation through Cutter POC (access to Base must go through Cutter POC) Location: USCG Base Charleston 1050 Register Street, Bldg 681 North Charleston, SC 29405 Background: The intake piping 4 bolt flange to the head of MPAC portion described was lost during movement between ships. Summary: CTR to provide the requested service Statement of Work: CTR will: Fabricate, install, MPAC piping. Measurements: 4-bolt flange, thickness 3/4”, bolt holes ¾”. 2 1/8 ID pipe x 11” length 90 degree elbow 3 ¾” threaded pipe x 4” length Threaded pipe clamp OD 3 ½” Oversee operational testing of pipe, submit CFR with results Additional images provided separately Gov. Furnished Equipment: 4310-01-549-7882, Air Compressor Unit Ship Contacts: LCDR David Kent, Engineer Officer David.E.Kent@uscg.mil