Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70Z08521QP45B2600
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This annou...
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-84 dated Nov 1, 2015. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. Past performance will be considered in the selection of the awarded vendor. Scope of Work: CGC BERTHOLF Reefer Repair The CTR shall be familiar familiar with 3.2 Ton York refrigeration units containing Blitzer model HSN5353-25-40-P compressor with R-134A. KTR must be familiar with brazing and general pipe repair for R-134a and ship board hot work. The CTR shall complete the following: 1. Remove existing isolation valves, solenoid operated valves, and strainers identified by CG personnel and references components highlighted in yellow for reference only. Configuration onsite may vary. 2. Repair or rebuild existing pipe runs between components that are leaking or have been damaged. 3. Install provided valves and strainers. 4. Conduct pressure test of system to ensure leak free installation, to be witnessed by CG peroneal. 5. Conduct groom of system after fully operational, submit CFR with findings. 6. Provide Marine Chemist to certify spaces for any hot work. Coast Guard will provide the following parts: 1. (8) 5/8 solenoid valves 2. (2) ¼ inch solenoid valves 3. (2) Bitzer solenoid valves 4. (1) 5/8 ball valve 5. (13) 3/8 padmount valves 6. (6) Brass strainers Period of Performance: Primary: 5 APR – 16 APR Place of Performance: Coast Guard Island, Alameda, CA? INTERESTED VENDORS PLEASE SEND OFFICIAL QUOTE, WITH A SAM.GOV REGISTERED DUNS NUMBER, AND EMAIL TO ANTHONY.J.ANDALUZ@USCG.MIL COST BREAKDOWN OF QUOTE INCLUDING BUT NOT LIMITED TO LABOR COST PER HOUR AND MATERIALS IS REQUIRED.