Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70Z08021-Q-PP45A9800
The contractor shall certify the fuel tank and Hawser Stowage space safe for hotwork. Clad weld an area of up to 1 sqft on the tank top, as determined by CG inspector. Preserve Hawser Stowage space de...
The contractor shall certify the fuel tank and Hawser Stowage space safe for hotwork. Clad weld an area of up to 1 sqft on the tank top, as determined by CG inspector. Preserve Hawser Stowage space deck in accordance with SFLC Std Spec 6310 from starboard bulkhead inward 4 ft for a length of 14 ft (56 sqft). The contractor shall crop and renew up to 3 sqft of deck plating on the fantail, as designated by Coast Guard inspector. The Contractor shall ensure all work is completed in accordane with the attached Statement of Work(SOW).