Inactive
Notice ID:70Z08019Q21279B00
The U. S. Coast Guard Surface Forces Logistics Center, Medium Endurance Cutter Product Line, has a requirement for Original Equipment Manufacturer (OEM), Appleton Marine, single point davit crane asse...
The U. S. Coast Guard Surface Forces Logistics Center, Medium Endurance Cutter Product Line, has a requirement for Original Equipment Manufacturer (OEM), Appleton Marine, single point davit crane assemblies, miscellaneous spare parts for inventory stock, and the overhaul of the crane assemblies. These supplies are required for the crane assemblies installed on U.S. Coast Guard Medium Endurance Cutters. The Coast Guard does not possess the propreitary technical specifications, drawings, manufacturing/provisioning data, or special tools necessary to provide these supplies or complete the overhauls. This information was not purchased at the time of the original acquisition and is proprietary to the OEM, Appleton Marine. It is the Government's belief that only Appleton Marine in Appleton, Wisconsin, has the capability to provide the supplies and perform the overhauls as they are the OEM of the single paint davit crane assembly and parts. However, potential sources may submit information demonstrating their capabilities to provide genuine OEM supplies and demonstrate their ability to access OEM technical information required to complete the overhauls to OEM like-new condition. Potential sources should submit the following, but not limited to: (1) Data that required support and supplies have been satisfactorily provided to the OEM or the Governmnet in the past, AND (2) a written letter, signed by the OEM, verifying the interested party's authority to supply OEM manufactured items and parts to the Government, as well as having access to the necessary technical information to complete overhauls. The Government DOES NOT intend to pay for any information that is submitted in response to this sources sought notice. The above information must be received no later than fifteen (15) calendar days from the date this notice is published. Information received after this period may not be considered.