Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70Z080-20-Q-P4548400
The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified to perfo...
The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified to perform Dockside Repairs to the USCGC STEADFAST (WMEC- 623) in exact accordance with this solicitation and attached specifications. All work is to be performed in accordance with USCGC STEADFAST (WMEC-623) Specification for Dockside Depot Maintenance FY19, REV-0, 31 October 2019. CGC STEADFAST’s homeport is Warrenton, OR Work covered by this solicitation, specification and resulting contract shall be completed within fifty six (56) calendar days from the date the vessel becomes available to the Contractor. The availability period of performance is 27 April 2020 and end on 21 June 2020.