Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70Z05221QPRW030
The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to furnish and install a complete functioning sewage lift station system to...
The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to furnish and install a complete functioning sewage lift station system to include sewage pumps (2), rail system, piping, wiring, electrical controls, sensors, alarms, and enclosures (Fig.2, Fig.3) at the sewage lift station adjacent to building 5214 (Fig.1) located on USCG Base Cape Cod in Bourne, MA 02542. Contract to include demo and disposal of existing. SEE FULL SOW ATTACHED FOR DETAILS