Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70Z05221QPFH31000
EDIT #2: The SITE VISIT DATE HAS CHANGED!! The site visit will now be on Tuesday March 30th at 9:00 am. EDIT #1: The SF18 had the incorrect date of 4/9/2021 and should be 4/8/2021. This was corrected ...
EDIT #2: The SITE VISIT DATE HAS CHANGED!! The site visit will now be on Tuesday March 30th at 9:00 am. EDIT #1: The SF18 had the incorrect date of 4/9/2021 and should be 4/8/2021. This was corrected on the new attached SF18 Requirements: The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units: SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted.