80' ARTICULATING BOOM LIFT
The U.S. Coast Guard Surface Forces Logistics Center seeks a firm fixed-price purchase order for an 80' articulating boom lift for work on the cutter Benjamin Bottoms in Long Beach, CA. The performance location is USCG Base LA/LB in San Pedro, CA, with services required from March 13 to March 23, 2026, with a weekly extension option. Quotes will be evaluated on a best-value basis, considering technical requirements, price, and the ability to meet deadlines. All quotes must include professionally engineered drawings as specified in the Statement of Work. Invoicing must be processed through the IPP system, and the vendor assumes financial responsibility until the order is accepted and received.