Replace Building Boiler at USCG North Bend, OR
The U.S. Coast Guard requires a contractor to remove and replace an existing hydronic boiler, including associated components, control programming, commissioning, and training, at the McAdams Building at Coast Guard Base North Bend, Oregon. A firm-fixed-price contract will be issued, and the acquisition is 100% set aside for small businesses under NAICS 238220 with a $19M size standard. A site visit is scheduled for September 14, 2026, and is highly encouraged. Offerors must submit a price quotation and a technical proposal, with award based on the lowest-priced technically acceptable offer. Performance will be at the specified North Bend, Oregon location.