Station Coos Bay Diesel Generator Replacement
The U.S. Coast Guard requires a contractor to remove an existing 40 kW standby diesel generator and replace it with a new system of equivalent specifications at Station Coos Bay in Charleston, OR. The work includes upgrading the Automatic Bypass Transfer Switch, ensuring proper exhaust and ventilation, and renewing fuel system piping, with the entire generator assembly limited to a maximum width of 34 ¾ inches to fit through the access doorway. This acquisition is a firm-fixed-price purchase order set aside 100% for small businesses. A site visit is scheduled for June 4, 2026, and all quotes are due by June 18, 2026, with the project required to be completed by July 31, 2026. No budget amount is specified in the description.