Repair and Refurbishment of Soffit and Eaves – Building 3760, USCG Station Pensacola
This is a combined synopsis/solicitation for a firm-fixed-price construction contract to perform comprehensive repairs and refurbishment of the soffit and eaves of Building 3760 at USCG Station Pensacola, Florida. The project scope includes repairing wood sections, sanding and sealing surfaces, repainting a beam, replacing vents, and managing debris disposal. The performance period is 120 calendar days from the Notice to Proceed, and all work must be performed at the specified location in Pensacola, FL. The contract is 100% set aside for Small Business, and award will be made to the lowest price, technically acceptable, responsible bidder. A site visit is strongly urged and must be scheduled with the designated point of contact prior to bid submission.