Replacement Transformer and Shore Tie at CGC WYACONDA
The United States Coast Guard seeks a qualified electrical contractor for shore-side electrical construction work in Dubuque, Iowa, to support the USCGC WYACONDA. The scope involves installing a three-phase buck/boost transformer between the utility metering point and the shore tie receptacle. This is a firm-fixed-price, small business set-aside contract, with award based on the lowest price technically acceptable. Offerors are urged to inspect the site, and all work must be coordinated through the designated Government Point of Contact. The performance requires delivery to the specified location in Dubuque, Iowa.