USCG Sector Delaware Bay Shower Replacement
The U.S. Coast Guard requires complete replacement of 15 showers, including shower pans, prefabricated fiberglass wall surrounds, and tile patching/matching or an accent border, with the contractor providing all personnel, equipment, tools, transportation, supervision, and services. Q&A updates issued 8/28, 9/11, and 9/15/2026 confirm the scope should add isolation valves in bathroom areas (at least one per shower head, seven total), provide staging space for a dumpster and equipment, and include investigation/repair of the leaking ADA shower pan and drain fixture in the men’s locker room. A possible ceiling leak above the second-floor men’s locker room is excluded, and the 8/28/2026 attachment updates incorporate answers on bid bonds/evaluation criteria into the SOW, Construction RFQ Clauses, and SF-1442. Further questions are directed to the Contracting Officer’s Representative, and performance involves USCG mechanical/bathroom areas and the men’s locker room.