REMOVE AND REPLACE EXISTING FAILED BOILER SYSTEM, USCG STATION SHINNECOCK, HAMPTON BAYS, NY 11946-3223
70Z02426Q0000012
The contractor must provide all labor, materials, equipment, transportation, disposal, and supervision to remove and replace failed boiler equipment at USCG Station Shinnecock in Hampton Bays, NY. A firm fixed price quote is required, including a detailed breakdown and the lead time for the replacement boiler. Service Contract Labor Standards apply.