REMOVE AND REPLACE EXISTING FAILED BOILER SYSTEM, USCG STATION SHINNECOCK, HAMPTON BAYS, NY 11946-3223
The contractor will provide all labor, materials, equipment, transportation, disposal, and supervision to remove and replace the failed boiler equipment at USCG Station Shinnecock in Hampton Bays, NY. A firm fixed-price quote is required, including a detailed breakdown and the lead time for the replacement boiler. Service Contract Labor Standards (FAR 52.222-41) apply. Questions and site visit coordination are handled through specified USCG contacts.