Inactive
Notice ID:70LGLY22RSSB00008
This requirement is for the resurfacing and lane painting of the running track at Building 256 and adding a one (1) foot wide concrete border, on both the inside and outside of the track. The track is...
This requirement is for the resurfacing and lane painting of the running track at Building 256 and adding a one (1) foot wide concrete border, on both the inside and outside of the track. The track is approximately ΒΌ mile in length. Drainage improvements will also be made to track area. The parking lot will also be expanded and made larger with asphalt millings and a new rope fence will be installed around perimeter of parking area. *Magnitude of Construction: BETWEEN $500,000. and $1,000,000. *