Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:70FA4020Q00000022
200918/0827: The purpose of this Amendment is to answer questions received via email. This does not extend the offer due date/time. The contractor shall remove and dispose of all hardware, drapes and ...
200918/0827: The purpose of this Amendment is to answer questions received via email. This does not extend the offer due date/time. The contractor shall remove and dispose of all hardware, drapes and blinds in Building N offices/corridors/hallways on the third and fourth floors of Building N and the first floor of Building L. All existing penetrations that cannot be reutilized for drapery reinstallation shall be repaired and spot painted with two coats of Duron Moon Mist paint to match the existing paint. [See Attached RFQ Document for All Details]