Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

ICE is soliciting a competitive, large-business-only IDIQ construction contract for new construction, renovation, and repair at its owned Service Processing Centers. The scope includes general construction, alterations, maintenance, demolition, and design-build services, with work issued via firm-fixed-price task orders. The contract period of performance is five years, with awards anticipated by 25 September 2026 and an effective date of 30 September 2026. Performance will be conducted onsite at ICE-owned Service Processing Centers both within and outside the continental United States. Attendance at recommended site visits is optional and not required for proposal submission.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Daniel Correia
Not Given

Links (0)

Attachments (47)

Document
Size
Access
Updated
Attachment N RFP Questions Government Repsonses 8.17.2026.docx
74.6 KB
Public
Aug 17, 2026
SACC IDIQ Solicitation rev Aug 12 2026.pdf
943.66 KB
Public
Aug 13, 2026
REVISED Attachment H2 OFTP Classroom 8 12 2026.pdf
1.26 MB
Public
Aug 13, 2026
REVISED Attachment H1 PIDC SHU SOW 8 12 2026.pdf
1.13 MB
Public
Aug 13, 2026
REVISED Appendix J Electronic Security System SOW PIDC 3 7 25.pdf
1.31 MB
Public
Aug 13, 2026
Attachment N RFPQuestions Government Repsonses 8 13 2026.pdf
336.54 KB
Public
Aug 13, 2026
SF 1442_70CMSW26R00000012.pdf
214.15 KB
Public
Aug 13, 2026
SF 30_70CMSW26R00000012.pdf
118.35 KB
Public
Aug 13, 2026
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf
1.02 MB
Public
Aug 3, 2026
APPENDIX F - Ft. Benning Installation Design Guidelines.pdf
105.03 MB
Public
Aug 3, 2026
APPENDIX C - ARCHITECTURAL PLAN DEVIATIONS.pdf
482.27 KB
Public
Aug 3, 2026
APPENDIX N - ALEKNO AREA UTILITY MAP.pdf
4.05 MB
Public
Aug 3, 2026
APPENDIX M- ICE VTC SOW.pdf
783.73 KB
Public
Aug 3, 2026
APPENDIX L - ICE SITE SPECIFIC CANBLING REQUIREMENTS.pdf
1.68 MB
Public
Aug 3, 2026
APPENDIX K - ICE ESS SOW.pdf
1.15 MB
Public
Aug 3, 2026
APPENDIX J - Ft. Benning NEC ISP-OSP TTP v2.1.pdf
21.28 MB
Public
Aug 3, 2026
APPENDIX I - VSS spec for D-B.pdf
340.02 KB
Public
Aug 3, 2026
APPENDIX H - ICE Facility Design Guide (2025).pdf
33.72 MB
Public
Aug 3, 2026
APPENDIX G - ICE Cabling Standard.pdf
788.17 KB
Public
Aug 3, 2026
APPENDIX E - CUBBY-LOCKER COMBO DETAIL.pdf
452.63 KB
Public
Aug 3, 2026
APPENDIX D - SITE PLAN DEVIATIONS.pdf
1.4 MB
Public
Aug 3, 2026
APPENDIX B - Project Manual.pdf
118.77 MB
Public
Aug 3, 2026
APPENDIX A - 35 Concept Drawings.pdf
29.93 MB
Public
Aug 3, 2026
Attachment L_Task Order Pricing Template.xlsx
94.89 KB
Public
Jul 21, 2026
Attachment K_IDIQ Pricing Template.xlsx
14.22 KB
Public
Jul 21, 2026
Attachment E - Scenario 5_Florence SHU SOW.pdf
1019.93 KB
Public
Jul 20, 2026
Attachment F - Scenario 6_Krome SHU SOW.pdf
1020.01 KB
Public
Jul 20, 2026
Attachment N_RFP Questions Submission Template.docx
23.69 KB
Public
Jul 20, 2026
Final _SACC SOW_7.1.2026 1_KI.docx
82.73 KB
Public
Jul 16, 2026
PIDC SHU SOW May 2026.docx
500.57 KB
Public
Jul 16, 2026
OFTP Classroom SOW Final 7 6 2026.docx
392.14 KB
Public
Jul 16, 2026
St. Thomas SHU SOW.docx
485.07 KB
Public
Jul 16, 2026
EL PASO SHU SOW.docx
481.73 KB
Public
Jul 16, 2026
El Centro SHU SOW.docx
478.73 KB
Public
Jul 16, 2026
Batavia SHU SOW.docx
482.17 KB
Public
Jul 16, 2026
Aquadilla SHU SOW.docx
488.46 KB
Public
Jul 16, 2026
Appendix J - Electronic Security Systems.pdf
753.84 KB
Public
Jul 16, 2026
Appendix I - Prison Rape Elimination Act.pdf
607.68 KB
Public
Jul 16, 2026
Appendix H Performance-Based National Detention Standards.pdf
4.07 MB
Public
Jul 16, 2026
Appendix G - ICE Facility Design Guide.pdf
33.72 MB
Public
Jul 16, 2026
Appendix F - ICE Dwg Stnds.pdf
5.84 MB
Public
Jul 16, 2026
Appendix E - ICE Cabling Standard.pdf
788.12 KB
Public
Jul 16, 2026
Appendix D - VSS spec for D-B.pdf
340.02 KB
Public
Jul 16, 2026
Appendix C - SPC Detention Construction Stnds.pdf
1.41 MB
Public
Jul 16, 2026
Appendix B - Geotech Rpt.pdf
7.21 MB
Public
Jul 16, 2026
Appendix A - PIDC Concept Dwgs.pdf
14.88 MB
Public
Jul 16, 2026
SACC IDIQ Solicitation_15 July 2026.pdf
930.37 KB
Public
Jul 16, 2026


Data sourced from SAM.gov. View Official Posting »

Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

This is a large-business-only competitive solicitation for a Single Award IDIQ construction contract supporting ICE’s owned Service Processing Centers. Scope includes new construction, renovation, repair, demolition, design-build, and maintenance of facilities. The contract will have a five-year period of performance, with awards anticipated by September 25, 2026, and no phase-in period. Work will be performed onsite at ICE-owned SPCs throughout and outside the continental United States. Attendance at optional site visits is recommended but not required for proposal submission.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Daniel Correia
Not Given

Links (0)

Attachments (46)

Document
Size
Access
Updated
SACC IDIQ Solicitation rev Aug 12 2026.pdf
943.66 KB
Public
Aug 13, 2026
REVISED Attachment H2 OFTP Classroom 8 12 2026.pdf
1.26 MB
Public
Aug 13, 2026
REVISED Attachment H1 PIDC SHU SOW 8 12 2026.pdf
1.13 MB
Public
Aug 13, 2026
REVISED Appendix J Electronic Security System SOW PIDC 3 7 25.pdf
1.31 MB
Public
Aug 13, 2026
Attachment N RFPQuestions Government Repsonses 8 13 2026.pdf
336.54 KB
Public
Aug 13, 2026
SF 1442_70CMSW26R00000012.pdf
214.15 KB
Public
Aug 13, 2026
SF 30_70CMSW26R00000012.pdf
118.35 KB
Public
Aug 13, 2026
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf
1.02 MB
Public
Aug 3, 2026
APPENDIX F - Ft. Benning Installation Design Guidelines.pdf
105.03 MB
Public
Aug 3, 2026
APPENDIX C - ARCHITECTURAL PLAN DEVIATIONS.pdf
482.27 KB
Public
Aug 3, 2026
APPENDIX N - ALEKNO AREA UTILITY MAP.pdf
4.05 MB
Public
Aug 3, 2026
APPENDIX M- ICE VTC SOW.pdf
783.73 KB
Public
Aug 3, 2026
APPENDIX L - ICE SITE SPECIFIC CANBLING REQUIREMENTS.pdf
1.68 MB
Public
Aug 3, 2026
APPENDIX K - ICE ESS SOW.pdf
1.15 MB
Public
Aug 3, 2026
APPENDIX J - Ft. Benning NEC ISP-OSP TTP v2.1.pdf
21.28 MB
Public
Aug 3, 2026
APPENDIX I - VSS spec for D-B.pdf
340.02 KB
Public
Aug 3, 2026
APPENDIX H - ICE Facility Design Guide (2025).pdf
33.72 MB
Public
Aug 3, 2026
APPENDIX G - ICE Cabling Standard.pdf
788.17 KB
Public
Aug 3, 2026
APPENDIX E - CUBBY-LOCKER COMBO DETAIL.pdf
452.63 KB
Public
Aug 3, 2026
APPENDIX D - SITE PLAN DEVIATIONS.pdf
1.4 MB
Public
Aug 3, 2026
APPENDIX B - Project Manual.pdf
118.77 MB
Public
Aug 3, 2026
APPENDIX A - 35 Concept Drawings.pdf
29.93 MB
Public
Aug 3, 2026
Attachment L_Task Order Pricing Template.xlsx
94.89 KB
Public
Jul 21, 2026
Attachment K_IDIQ Pricing Template.xlsx
14.22 KB
Public
Jul 21, 2026
Attachment E - Scenario 5_Florence SHU SOW.pdf
1019.93 KB
Public
Jul 20, 2026
Attachment F - Scenario 6_Krome SHU SOW.pdf
1020.01 KB
Public
Jul 20, 2026
Attachment N_RFP Questions Submission Template.docx
23.69 KB
Public
Jul 20, 2026
Final _SACC SOW_7.1.2026 1_KI.docx
82.73 KB
Public
Jul 16, 2026
PIDC SHU SOW May 2026.docx
500.57 KB
Public
Jul 16, 2026
OFTP Classroom SOW Final 7 6 2026.docx
392.14 KB
Public
Jul 16, 2026
St. Thomas SHU SOW.docx
485.07 KB
Public
Jul 16, 2026
EL PASO SHU SOW.docx
481.73 KB
Public
Jul 16, 2026
El Centro SHU SOW.docx
478.73 KB
Public
Jul 16, 2026
Batavia SHU SOW.docx
482.17 KB
Public
Jul 16, 2026
Aquadilla SHU SOW.docx
488.46 KB
Public
Jul 16, 2026
Appendix J - Electronic Security Systems.pdf
753.84 KB
Public
Jul 16, 2026
Appendix I - Prison Rape Elimination Act.pdf
607.68 KB
Public
Jul 16, 2026
Appendix H Performance-Based National Detention Standards.pdf
4.07 MB
Public
Jul 16, 2026
Appendix G - ICE Facility Design Guide.pdf
33.72 MB
Public
Jul 16, 2026
Appendix F - ICE Dwg Stnds.pdf
5.84 MB
Public
Jul 16, 2026
Appendix E - ICE Cabling Standard.pdf
788.12 KB
Public
Jul 16, 2026
Appendix D - VSS spec for D-B.pdf
340.02 KB
Public
Jul 16, 2026
Appendix C - SPC Detention Construction Stnds.pdf
1.41 MB
Public
Jul 16, 2026
Appendix B - Geotech Rpt.pdf
7.21 MB
Public
Jul 16, 2026
Appendix A - PIDC Concept Dwgs.pdf
14.88 MB
Public
Jul 16, 2026
SACC IDIQ Solicitation_15 July 2026.pdf
930.37 KB
Public
Jul 16, 2026


Data sourced from SAM.gov. View Official Posting »

Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

This is a large-business-only competitive acquisition for an Indefinite Delivery Indefinite Quantity (IDIQ) construction contract supporting ICE’s owned Service Processing Centers. The scope includes new construction, renovation, repair, demolition, and design-build services, with multiple Single Award IDIQs and Firm-Fixed Price task orders anticipated. The contract period of performance is five years from award, with awards anticipated by 25 September 2026 and an effective date of 30 September 2026, with no phase-in period. Performance will be conducted onsite at ICE-owned Service Processing Centers both within and outside the continental United States. No budget amount is specified in the description.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Daniel Correia
Not Given

Links (0)

Attachments (40)

Document
Size
Access
Updated
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf
1.02 MB
Public
Aug 3, 2026
APPENDIX F - Ft. Benning Installation Design Guidelines.pdf
105.03 MB
Public
Aug 3, 2026
APPENDIX C - ARCHITECTURAL PLAN DEVIATIONS.pdf
482.27 KB
Public
Aug 3, 2026
APPENDIX N - ALEKNO AREA UTILITY MAP.pdf
4.05 MB
Public
Aug 3, 2026
APPENDIX M- ICE VTC SOW.pdf
783.73 KB
Public
Aug 3, 2026
APPENDIX L - ICE SITE SPECIFIC CANBLING REQUIREMENTS.pdf
1.68 MB
Public
Aug 3, 2026
APPENDIX K - ICE ESS SOW.pdf
1.15 MB
Public
Aug 3, 2026
APPENDIX J - Ft. Benning NEC ISP-OSP TTP v2.1.pdf
21.28 MB
Public
Aug 3, 2026
APPENDIX I - VSS spec for D-B.pdf
340.02 KB
Public
Aug 3, 2026
APPENDIX H - ICE Facility Design Guide (2025).pdf
33.72 MB
Public
Aug 3, 2026
APPENDIX G - ICE Cabling Standard.pdf
788.17 KB
Public
Aug 3, 2026
APPENDIX E - CUBBY-LOCKER COMBO DETAIL.pdf
452.63 KB
Public
Aug 3, 2026
APPENDIX D - SITE PLAN DEVIATIONS.pdf
1.4 MB
Public
Aug 3, 2026
APPENDIX B - Project Manual.pdf
118.77 MB
Public
Aug 3, 2026
APPENDIX A - 35 Concept Drawings.pdf
29.93 MB
Public
Aug 3, 2026
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf (deleted)
1.02 MB
Public
Jul 27, 2026
Attachment L_Task Order Pricing Template.xlsx
94.89 KB
Public
Jul 21, 2026
Attachment K_IDIQ Pricing Template.xlsx
14.22 KB
Public
Jul 21, 2026
Attachment E - Scenario 5_Florence SHU SOW.pdf
1019.93 KB
Public
Jul 20, 2026
Attachment F - Scenario 6_Krome SHU SOW.pdf
1020.01 KB
Public
Jul 20, 2026
Attachment N_RFP Questions Submission Template.docx
23.69 KB
Public
Jul 20, 2026
Final _SACC SOW_7.1.2026 1_KI.docx
82.73 KB
Public
Jul 16, 2026
PIDC SHU SOW May 2026.docx
500.57 KB
Public
Jul 16, 2026
OFTP Classroom SOW Final 7 6 2026.docx
392.14 KB
Public
Jul 16, 2026
St. Thomas SHU SOW.docx
485.07 KB
Public
Jul 16, 2026
EL PASO SHU SOW.docx
481.73 KB
Public
Jul 16, 2026
El Centro SHU SOW.docx
478.73 KB
Public
Jul 16, 2026
Batavia SHU SOW.docx
482.17 KB
Public
Jul 16, 2026
Aquadilla SHU SOW.docx
488.46 KB
Public
Jul 16, 2026
Appendix J - Electronic Security Systems.pdf
753.84 KB
Public
Jul 16, 2026
Appendix I - Prison Rape Elimination Act.pdf
607.68 KB
Public
Jul 16, 2026
Appendix H Performance-Based National Detention Standards.pdf
4.07 MB
Public
Jul 16, 2026
Appendix G - ICE Facility Design Guide.pdf
33.72 MB
Public
Jul 16, 2026
Appendix F - ICE Dwg Stnds.pdf
5.84 MB
Public
Jul 16, 2026
Appendix E - ICE Cabling Standard.pdf
788.12 KB
Public
Jul 16, 2026
Appendix D - VSS spec for D-B.pdf
340.02 KB
Public
Jul 16, 2026
Appendix C - SPC Detention Construction Stnds.pdf
1.41 MB
Public
Jul 16, 2026
Appendix B - Geotech Rpt.pdf
7.21 MB
Public
Jul 16, 2026
Appendix A - PIDC Concept Dwgs.pdf
14.88 MB
Public
Jul 16, 2026
SACC IDIQ Solicitation_15 July 2026.pdf
930.37 KB
Public
Jul 16, 2026


Data sourced from SAM.gov. View Official Posting »

Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

This opportunity is a large business only, single award IDIQ construction contract for new construction, renovation, and repair of ICE’s owned Service Processing Centers. Performance will be conducted onsite at these facilities throughout and outside the continental United States. The contract will have a five-year period of performance, with award anticipated by 25 September 2026 and an effective date of 30 September 2026. Work includes general construction, alteration, renovation, demolition, design-build, and new building construction under firm-fixed price task orders. Contractors must have capacity to manage single task orders across mission-critical facility needs.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Daniel Correia
Not Given

Links (0)

Attachments (25)

Document
Size
Access
Updated
APPENDIX O - ALEKNO AREA UTILITY MAPs UPDATED.pdf
1.02 MB
Public
Jul 27, 2026
Attachment L_Task Order Pricing Template.xlsx
94.89 KB
Public
Jul 21, 2026
Attachment K_IDIQ Pricing Template.xlsx
14.22 KB
Public
Jul 21, 2026
Attachment E - Scenario 5_Florence SHU SOW.pdf
1019.93 KB
Public
Jul 20, 2026
Attachment F - Scenario 6_Krome SHU SOW.pdf
1020.01 KB
Public
Jul 20, 2026
Attachment N_RFP Questions Submission Template.docx
23.69 KB
Public
Jul 20, 2026
Final _SACC SOW_7.1.2026 1_KI.docx
82.73 KB
Public
Jul 16, 2026
PIDC SHU SOW May 2026.docx
500.57 KB
Public
Jul 16, 2026
OFTP Classroom SOW Final 7 6 2026.docx
392.14 KB
Public
Jul 16, 2026
St. Thomas SHU SOW.docx
485.07 KB
Public
Jul 16, 2026
EL PASO SHU SOW.docx
481.73 KB
Public
Jul 16, 2026
El Centro SHU SOW.docx
478.73 KB
Public
Jul 16, 2026
Batavia SHU SOW.docx
482.17 KB
Public
Jul 16, 2026
Aquadilla SHU SOW.docx
488.46 KB
Public
Jul 16, 2026
Appendix J - Electronic Security Systems.pdf
753.84 KB
Public
Jul 16, 2026
Appendix I - Prison Rape Elimination Act.pdf
607.68 KB
Public
Jul 16, 2026
Appendix H Performance-Based National Detention Standards.pdf
4.07 MB
Public
Jul 16, 2026
Appendix G - ICE Facility Design Guide.pdf
33.72 MB
Public
Jul 16, 2026
Appendix F - ICE Dwg Stnds.pdf
5.84 MB
Public
Jul 16, 2026
Appendix E - ICE Cabling Standard.pdf
788.12 KB
Public
Jul 16, 2026
Appendix D - VSS spec for D-B.pdf
340.02 KB
Public
Jul 16, 2026
Appendix C - SPC Detention Construction Stnds.pdf
1.41 MB
Public
Jul 16, 2026
Appendix B - Geotech Rpt.pdf
7.21 MB
Public
Jul 16, 2026
Appendix A - PIDC Concept Dwgs.pdf
14.88 MB
Public
Jul 16, 2026
SACC IDIQ Solicitation_15 July 2026.pdf
930.37 KB
Public
Jul 16, 2026


Data sourced from SAM.gov. View Official Posting »

Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

This opportunity is a large-business-only, single-award IDIQ contract for new construction, renovation, and repair at ICE’s owned Service Processing Centers. The contract has a five-year period of performance, with awards anticipated by September 25, 2026, and an effective date of September 30, 2026. Performance will be conducted onsite at ICE facilities both within and outside the continental United States. No budget information was specified in the description. The scope includes general construction, renovation, demolition, design-build, and maintenance services.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Daniel Correia
Not Given

Links (0)

Attachments (24)

Document
Size
Access
Updated
Attachment L_Task Order Pricing Template.xlsx
94.89 KB
Public
Jul 21, 2026
Attachment K_IDIQ Pricing Template.xlsx
14.22 KB
Public
Jul 21, 2026
Attachment E - Scenario 5_Florence SHU SOW.pdf
1019.93 KB
Public
Jul 20, 2026
Attachment F - Scenario 6_Krome SHU SOW.pdf
1020.01 KB
Public
Jul 20, 2026
Attachment N_RFP Questions Submission Template.docx
23.69 KB
Public
Jul 20, 2026
Final _SACC SOW_7.1.2026 1_KI.docx
82.73 KB
Public
Jul 16, 2026
PIDC SHU SOW May 2026.docx
500.57 KB
Public
Jul 16, 2026
OFTP Classroom SOW Final 7 6 2026.docx
392.14 KB
Public
Jul 16, 2026
St. Thomas SHU SOW.docx
485.07 KB
Public
Jul 16, 2026
EL PASO SHU SOW.docx
481.73 KB
Public
Jul 16, 2026
El Centro SHU SOW.docx
478.73 KB
Public
Jul 16, 2026
Batavia SHU SOW.docx
482.17 KB
Public
Jul 16, 2026
Aquadilla SHU SOW.docx
488.46 KB
Public
Jul 16, 2026
Appendix J - Electronic Security Systems.pdf
753.84 KB
Public
Jul 16, 2026
Appendix I - Prison Rape Elimination Act.pdf
607.68 KB
Public
Jul 16, 2026
Appendix H Performance-Based National Detention Standards.pdf
4.07 MB
Public
Jul 16, 2026
Appendix G - ICE Facility Design Guide.pdf
33.72 MB
Public
Jul 16, 2026
Appendix F - ICE Dwg Stnds.pdf
5.84 MB
Public
Jul 16, 2026
Appendix E - ICE Cabling Standard.pdf
788.12 KB
Public
Jul 16, 2026
Appendix D - VSS spec for D-B.pdf
340.02 KB
Public
Jul 16, 2026
Appendix C - SPC Detention Construction Stnds.pdf
1.41 MB
Public
Jul 16, 2026
Appendix B - Geotech Rpt.pdf
7.21 MB
Public
Jul 16, 2026
Appendix A - PIDC Concept Dwgs.pdf
14.88 MB
Public
Jul 16, 2026
SACC IDIQ Solicitation_15 July 2026.pdf
930.37 KB
Public
Jul 16, 2026


Data sourced from SAM.gov. View Official Posting »

Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

This opportunity is a large-business-only, single-award IDIQ construction contract for ICE’s Service Processing Centers, covering new construction, renovation, and repair. Performance will be conducted onsite at ICE-owned facilities throughout and outside the continental United States. The contract has a five-year period of performance, with awards anticipated by 25 September 2026 and an effective date of 30 September 2026. No budget amounts are specified in the description. The scope includes general construction, design-build, demolition, and maintenance services.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Daniel Correia
Not Given

Links (0)

Attachments (22)


Data sourced from SAM.gov. View Official Posting »

Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

This opportunity is a large-business-only, single-award IDIQ construction contract for ICE’s Service Processing Centers, covering new construction, renovation, and repair. The contract has a five-year period of performance, with awards anticipated by September 25, 2026, and an effective date of September 30, 2026. Performance will be conducted onsite at ICE-owned facilities both within and outside the continental United States. No budget amount is specified in the description. The scope includes general construction, design-build, demolition, and maintenance services.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

Single Award Construction Contract (SACC) Indefinite Delivery Indefinite Quantity (IDIQ)s

Notice ID:70CMSW26R00000012

This is a single-award IDIQ construction contract for new construction, renovation, and repair of ICE Service Processing Centers, restricted to large businesses only. The contract has a one-year base period with possible option periods, and performance will occur at owned ICE facilities. The scope includes general construction, design-build, demolition, and facility maintenance. Evaluation factors include bonding capacity, past performance, management plan, and price. The solicitation is expected to be posted no later than 17 July 2026.

Department/Ind.Agency Subtier Office
HOMELAND SECURITY, DEPARTMENT OF U.S. IMMIGRATION AND CUSTOMS ENFORCEMENT MISSION SUPPORT WASHINGTON
  PSC   Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS
LOCATION: Not Given
Primary Contact
Daniel Correia
Not Given

Links (0)

Attachments (1)


Data sourced from SAM.gov. View Official Posting »