Total Small Business Set-Aside (FAR 19.5)
Notice ID:6010026003
The contractor shall furnish all labor, material, equipment, and transportation, change out leaking shower flooring, Coast Guard Academy, New London, Connecticut. All work shall be performed at the Co...
The contractor shall furnish all labor, material, equipment, and transportation, change out leaking shower flooring, Coast Guard Academy, New London, Connecticut. All work shall be performed at the Coast Guard Academy, 15 Mohegan Dr, New London, CT 06320 SEE STATEMENT OF WORK FOR FULL DETAILS QUOTE: PLEASE SUBMIT ON COMPANY LETTERHEAD ALONG WITH YOUR SAM.GOV UEI#.