Port Engine Removal / Install
The contractor will provide labor, equipment, crane services, materials, and facilities to perform a complete port engine replacement on a specified vessel. This includes removing the vessel from the water, removing the old engine and auxiliary systems per Coast Guard documentation, and installing a new Coast Guard-provided engine. The work also requires transferring all associated parts from the old engine to the new one. After installation, the contractor must return the vessel to the water and conduct sea trials with Coast Guard representatives present. The performance location is not specified.