Inactive
Notice ID:52000PR23Q0001252
**This is not a Small Business Set Aside** References: U. S. Coast Guard Coatings and Color Manual, COMDTINST M10360.3D (January 2014) U. S. Coast Guard Surface Forces Logistics Center Standard Specif...
**This is not a Small Business Set Aside** References: U. S. Coast Guard Coatings and Color Manual, COMDTINST M10360.3D (January 2014) U. S. Coast Guard Surface Forces Logistics Center Standard Specification 6310 (2020), Requirements for Preservation of Ship Structures Requirements: Provide authorized coating systems per SFLC Std Spec 6310, Appendix C, which meet the requirements of Table 1 below. For each system, assume a 30% loss. For systems which require stripe coat(s), assume that that 20% of the volume required for a full coat is required for a stripe coat. Colors for primer and intermediate coats must be in accordance with CIM 10360.3D. All multi-coat systems, including stripe coats, must be in contrasting colors for application. Table 1 – List of Coating Systems, Coverage, & Topcoat Color System per SFLC Std Spec 6310, Appendix A Coverage (Sq. Ft.) Description of Paint: 1. Smoke Stack (Smoke Stack Casing, Steel Exterior) (Stack Preservation) 6,000 White 17925 2. Smoke Stack (Smoke Stack Casing, Steel Exterior) (Stack Preservation) 2,000 Black 37038 Proposal Submission Requirements: For each system, identify for each coat, and include calculations as applicable: - Manufacturer - Product - National Stock Number or Part Number, as applicable - Color - Volume Solids - Dry Film Thickness - Theoretical Coverage (Sq. Ft./Gal) - Practical Coverage (Sq. Ft./Gal) – apply loss assumption here - Coat Gallons - Stripe Coat Gallons – apply stripe coat assumption here, if stripe coat is required - Total Gallons (Coat + Stripe Coat) - Number of Product Kits See the Appendix for an example presentation of the above information. For each product, submit a Product Data Sheet. Delivery Requirements: Include delivery to Honolulu, HI by 15 February 2023.