Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:37270QDL230000063
To include, but not limited to providing all parts, labor, materials, tools, and supervision to remove and install new AHU-2 Compressor for Bldg 100. Ensure refrigerant is removed, disposed of and new...
To include, but not limited to providing all parts, labor, materials, tools, and supervision to remove and install new AHU-2 Compressor for Bldg 100. Ensure refrigerant is removed, disposed of and new refrigerant applied IAW with local, state, and federal regulations. Replace compressor oil as necessary. Replace any filters needed. Perform any tests to ensure new equipment is operating properly. Provide a minimum warranty for all materials installed. This shall include any material imperfections or abnormalities. The contractor is responsible for complying with drawings and specifications prescribed by the manufacturer, prescribe inspection and testing. Ensure AHU-2 Compressor components are in operating status IAW manufactures specifications. SOW Modifcation_1, 6 June 2023. Extended until 21 June 2023, 10:00AM PDT. SOW Modificatoin_2, 7 June 2023. Amended site visit reference. Intend to publish date/time for site visits in the near future. SOW Mofification_3, 8 June 2023. Clarified site visit dates, answered additional questions. SOW Modification_4, 15 June 2023. Extended until 23 June 2023, 10:00AM PDT. SOW Modification_5, 28 June 2023. Extended until 28 June 2023, 10:00AM PDT.