Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:37020250000018
SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to replace a bathroom and a galley sewer pipe in the Multi-mission B...
SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to replace a bathroom and a galley sewer pipe in the Multi-mission Building (MMB). Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following. Removal of current failed/cracked cast iron sewer pipe in bathroom. Replace cracked pipe with heavy duty, to code, PVC pipe and connections. Confirm repair will not leak. Cut out and replace any studs/wood/drywall where there has been rot/water damage to this area. First, snake the current failed/clogged cast iron sewer pipe underneath galley from the clean-out, outside of the MMB. If current failed/clogged cast iron sewer pipe can’t be snaked, remove this failed/clogged pipe and replace with heavy duty, to code, PVC pipe and connections. Confirm repair will not leak. Replace concrete and tile floor in galley, as there is no basement under the galley area. Re-connect galley garbage disposal to be used by station. Use the Clean Out, outside of the MMB to make sure all sewage pipes flow to the city’s main line. Clean areas of debris and dispose materials.