FUEL TANK INTEGRITY TESTING
This contract requires a contractor to provide all resources necessary for external and internal inspections of aboveground fuel and potassium sodium tanks at USCG Base Cape Cod in Bourne, MA. The work includes wall thickness testing and internal inspections for three JP-8 tanks (one 30,000-gallon and two 15,000-gallon) located near taxiway delta, along with a detailed condition report and repair estimates. The performance period spans four years, with specific tanks scheduled for inspection each year: Year 1 focuses on the 30,000-gallon JP-8 tank, Year 2 on the two 15,000-gallon JP-8 tanks, Year 3 on two 10,000-gallon gasoline tanks, and Year 4 on a 5,000-gallon gasoline tank and two 5,000-gallon potassium sodium tanks. Inspections must follow STI SP001 and API 653 standards. No budget amount is specified.