Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:31060PR250000070
2/19/2025: add RFI Q/A, and attached 3 UFGS 2/12/2025:updated solicitation close date to 2/26/2025. Several RFIs still pending answering, and personel that can answer these questions will not return o...
2/19/2025: add RFI Q/A, and attached 3 UFGS 2/12/2025:updated solicitation close date to 2/26/2025. Several RFIs still pending answering, and personel that can answer these questions will not return ot office till 2/19/2025. will post Q/A of RFI, and possibly updated SOW once available. 2/11/2025: updated solicitation close date to 2/19/2025. Several RFIs still pending answering. will post Q/A of RFI once available. BASE ITEMS: Work includes but is not limited to: 1) Design and construct manhole benching and invert channels for WPB building manhole. 2) Inverts must be true to the sewer pipe invert elevation with smooth channels of uniform cross section and slop, either straight or with a continuous curve between the inlet and outlet of the pipes. Concrete inverts should be placed based on the dimension and details of the contract plans and specification. 3) Contractor shall follow OSHA section 1926.953 safety requirements for confined space entry before a manhole cover can be removed. 4) The Contractor shall perform, and atmospheric pressure build up test, temperature build up test an