Project scope consist of installation of an energy recovery system in AHU-1 and AHU-2 located on the first and second floors of the UPH Building in Base Portsmouth (Portsmouth, VA). Energy recovery sy...
Project scope consist of installation of an energy recovery system in AHU-1 and AHU-2 located on the first and second floors of the UPH Building in Base Portsmouth (Portsmouth, VA). Energy recovery system shall be Wrap-Around Heat Pipes installed around the cooling coil within the AHUs. Assess the AHUs and take required measurements to appropriately size the Wrap-Around Heat Pipes. Install Wrap-Around Heat Pipes in AHUs. Wrap-Around Heat Pipes shall be four-row coil wrap around and include coated fins, stainless-steel casing, and a drain pan in accordance with the attached Statement of Work.