Replace Eyewash Stations & Potable Water Piping
This small business set-aside solicitation seeks a firm-fixed-price construction contract to install four potable water eye wash stations, two commercial marine-grade self-retracting hose reels, and replace potable water piping on the pier at U.S. Coast Guard Station Venice, Louisiana. Performance must be completed within 30 days after receipt of order (ARO), with FOB destination to the station. Offerors are urged to inspect the site, and site visits can be coordinated through the Contracting Officer Representative. Award will be made on a lowest price, technically acceptable basis, evaluating price, technical acceptability, and past performance. All work must be coordinated with the point of contact to minimize operational impacts.