Sole Source J&A-firing range
20158566
The contractor will repair and enhance the existing HVAC and air barrier system at a 50-yard indoor firing range. All equipment, materials, labor, and subcontracting are to be provided by the contractor. The contractor must handle all aspects of indoor firing line ventilation design, operation, repair, and applicable environmental regulations. Additionally, the contractor will install two extra 360 flip targets and one carrier running man target spanning the range width.