The scope of work for this project includes the removal and replacement of two pumps, guiderails, bases, operation panel, float kits, electrical conduit and all accessories required for completion. Th...
The scope of work for this project includes the removal and replacement of two pumps, guiderails, bases, operation panel, float kits, electrical conduit and all accessories required for completion. The Contractor shall pump down sediment in the vault, inspect the vault and associated piping for deformities, leaks and provide a written report, with photos, of the status of the vault to the KO and COR for review. The contractor shall provide all labor and equipment to accomplish the scope of this work.