FEMA Region VI: Motor Control Panel Replacement
FEMA Region 6 is seeking a contractor to replace the aging Electric Motor Control Center at its facility in Denton, Texas. The project involves removing the old electrical panel and installing a new system, including wiring, breakers, and integration with existing infrastructure. The contractor must provide licensed journeymen electricians and a site supervisor, minimize disruptions, and demonstrate the ability to perform work within a 150-mile radius of Denton. This opportunity is set aside for SBA Certified Women-Owned Small Businesses (WOSB). A site visit is scheduled for Wednesday, September 9, 2026, at 10:00 a.m. Central Time at the Denton facility.